Tuesday

Walls & Roof







The walls and most of the roof were framed over the past two days. We're expecting rain tomorrow, so the crew will be back Thursday to finish the roof framing and sheathing.

Friday

Roof comes off, floor deck installed








Here the roof is removed and the second floor deck and temporary stairs are being installed. We're using engineered floor joists with the floor deck cantilevered at the front and the back of the house.

The Beginning









We're tracking the construction of a second story addition to a 1940's brick ranch in Mount Prospect, Illinois. The existing home is only two bedrooms and one bathroom, and the family of four needs more space! The addition will be approximately 1200 square feet and will include four bedrooms and two bathrooms. We'll also be remodeling a portion of the first floor where the new staircase will go, and we'll be replacing all the windows. This project was designed by a local architect that the homeowners hired. Posted here are pictures of the existing house, front and rear.